Lodè — marmi e pietre, Verona dal 1958

Lodè

Marmi e pietre  ·  Verona  ·  dal 1958

Marble and stone floors, quarried in Italy and cut to measure in our own workshop. One family, three generations, the same road up to the quarry.

Move the lamp across the slab
01 — La pietra

Le otto pietreEight stones, each from a quarry we know by name.

Cava · quarry
Formato
Spessore
Antiscivolo
02 — La finitura

Tre finitureOne stone, three surfaces. Choose how it meets the light.

PolishedLucido

Ground through eight grits until the light sits on top. Shows every vein, and every footprint.

HonedLevigato

Stopped at four grits. Soft, even, forgiving. What most people end up living with.

FlamedFiammato

Passed under a torch so the surface bursts into grip. For terraces, pool edges and wet feet.

03 — La luce

Dall'alba al tramontoSee it through a whole day before you decide.

07:10

06:0009:3013:0016:3020:00
04 — Il campionario

Il campionario

Then hold it in your hand.

A screen can show you the light. It can't show you the weight. Pick up to four pieces, 100 mm square, in the finish you chose. The box is free and we collect it after a fortnight.

A quarry face of pale stone, cracked along its beds
Cava n. 3, above Sant'Ambrogio di Valpolicella. The same face the family has worked since 1958.
La casa  ·  dal 1958

Tre generazioni

Three generations, one address.

Aurelio Lodè set up a single frame saw in a shed on Via delle Cave in 1958 and cut doorsteps and window sills for the village. The saw has been replaced four times. The shed is now the finishing hall, and the address has not changed.

We still buy block from quarries we can drive to, cut every order ourselves, and keep an offcut of each floor we have laid, numbered, in case a piece ever needs replacing. The oldest is from 1961.

«La pietra non si disegna. Si sceglie.»

Aurelio Lodè  ·  Stone isn't designed. It's chosen.
1958Aurelio

Opens the workshop with one frame saw. First orders are doorsteps for the village.

1987Marta

Adds the finishing hall. Lucido, levigato and fiammato are done under one roof for the first time.

2019Pietro & Elena

Third generation. Rooms are surveyed by laser now, but every slab is still chosen by eye, in daylight.

Progetti

Lavori

Where it ends up.

About two hundred floors a year, from a single bathroom to a cloister. Here are two of ours, and the one we are still trying to live up to.

A vaulted stone cloister with a long pale stone floor
Restauro · 2024Chiostro di Santa LenaTrani levigato · 420 m² · laid in 31 days
A bathroom lined in grey stone under a roof window
Casa privata · Milano · 2026Bagno sottotettoNero fiammato · 38 m² · floor, bath surround and walls
Ancient Roman basalt paving in front of an arcade of travertine arches
Roma · not oursBasolato, I secoloLaid two thousand years ago and still in use. This is the brief.
Catalogo n. 69  ·  2027

Scheda tecnica

The eight, in numbers.

Every stone is cut to your room, sealed before it ships and laid by a fitter we have worked with before. Prices include cutting; laying is quoted per job.

StoneTypeFormatThicknessSlipAl m²
iWe measure

A surveyor laser-scans the room. You get a drawing with every cut on it.

iiWe cut

Slabs are sawn to that drawing at the quarry, numbered, and dry-laid once to check.

iiiWe deliver

Crated in laying order, so the first piece out is the first piece down.

ivThey lay

One of forty fitters we know by name. Sealed again on the day, then yours.

Lodèdal 1958